1. Introduction 22. Important Safety Instructions 33. Battery Cabinet Installation 53.1 Preparation 53.2 Transportation 53.3 Mechanical Check 53
105. Maintenance5.1 Maintenance Schedule5.2 Fuse ReplacementQuarterly CheckMeasure individual battery unit temperature. (Measure with a digital thermo
11 6.1 Battery Cabinet Diagram (3 Shelves)6. DiagramsNote: All dimensions are in inches.28.806.0032.46.003.254.50 4.504.003.5010.5813.502.25 15.7560.0
12 Shelf 2 Shelf 3 Shelf 1 (Bottom) To Fuse or Breaker T
136.3 Integrated Battery Charger (Select Models)6. Diagrams (continued)6.25MAX0.512.513.5Notes:• All dimensions are in inches.• AC input is preset wit
147.1 Dimensions and Floor Loading7.2 Recommended Torque7. SpecificationsBattery Cabinet Model ShelvesDimensions(Width x Depth x Height)Weight Floor Lo
159. Warranty8. Storage and ServiceStorageThe battery cabinet must be stored in a clean, secure environment with a temperature less than 40° C (104° F
200809068 93-28471111 W. 35th Street, Chicago, IL 60609 USA+1.773.869.1234 • www.tripplite.com
21. IntroductionTripp Lite’s Extended-Run Single-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to provide long-lasting battery bac
32. Important Safety InstructionsSAVE THESE INSTRUCTIONS All sections of this manual contain instructions and warnings that must be followed during th
42. Important Safety Instructions (continued)Battery WarningsThe battery cabinet does not require routine maintenance by the user. There are no user-s
53.1 Preparation3.2 Transportation3.3 Mechanical Check3. Battery Cabinet InstallationRead Section 2 – Important Safety Instructions Before Installatio
63.4 Internal Wiring (Typical)3.5 Preliminary Electrical Check3.6 Battery Cabinet Placement3. Battery Cabinet Installation (continued)Battery cabinets
73.7 Electrical Connection3.8 Battery Charger Electrical Connection (Select Models)3.9 Final Electrical Check3. Battery Cabinet Installation (continue
8Additional battery strings can be daisy-chained to the UPS internal battery system via a unique connector inside the UPS battery compartment (Figure
94. Operation and Charging4.1 Determine Charging Voltages4.2 Initial Charge4.3 Operational Check4.4 Acceptance Test (Optional)To determine the appropr